I. Test Wiring
Binary Input A: The tester's trip-on/off output activates the auxiliary feedback contact → mark [Command issued at time T2]
Binary Input C: Main circuit breaker contact (the auxiliary contacts of the TWJ/HWJ position auxiliary relay must not be used; the auxiliary contacts exhibit mechanical hysteresis, causing the test results to be significantly distorted) → Marked as [Main contact position change time T3]
II. Key Considerations for Setting the Three State Parameters
State 1: Protection activation mode (pre-activation excitation, triggering the protection output)
• Output: three-phase voltage = 0 V, three-phase fault current = 5 A
• Function: Apply a fault condition so that the microcomputer protection system detects the fault, prepares the trip output, and awaits the trigger of the test sequence.
• Key settings:
State 2: Trigger state (issues a trip/close command; captures the command at time T2)
Output: The tester outputs a trip/close excitation command
Termination condition: flip-flop upon activation of contact A; latch time T2; automatically transition to state 3
Key settings:
State 3: Waiting for the switch to change state (maintain excitation; capture the main contact transition T3)
Output: Keep the excitation of state 2 unchanged (fault level and output command remain continuously active; no reset is permitted)
Termination condition: flip when the input to contact C changes; latch time T3; the test sequence terminates and waveforms are recorded.
Key settings:
III. Complete Temporal Logic Flow
Start test → Enter State 1: Apply a three-phase 0 V, 5 A fault current; activate protection; wait for the next step in the sequence to trigger
Under sequential flow, the actuation command is issued → enters state 2; the tester outputs a trip/close excitation; input A is flipped → latches T2, automatically switching to state 3
Enter State 3: Maintain all current outputs unchanged and wait for the circuit breaker body to complete its mechanical action; input C toggles → latches T3; test stops and recording is saved.
Automatic calculation: inherent opening/closing time of the circuit breaker = T3 − T2
IV. Scope of Application and Key Considerations
✅ Applicable items: testing of the circuit breaker's inherent opening time and inherent closing time ⚠️ Key points
When closing into C, the main circuit breaker contact must be connected; TWJ/HWJ are auxiliary relay contacts that exhibit hysteresis, causing the measured time to be longer than it should be; therefore, they cannot be used for the inherent opening and closing time.
This state sequence captures only the moment when the contact first changes position; it cannot measure contact bounce. If you need to measure the bounce time, you must enable high-sample-rate continuous recording separately and examine the break-point waveform.
1. Distinction of Concepts:
2. Pre-test inspection: Determine the polarity of the input/exit signal and verify the contact-state transition logic (normally open/normally closed) to prevent incorrect contact logic wiring, which could cause failure in timing capture.
V. List of Common Pitfalls in the Experiment
1. State 3: early return of fault count → protection returns, output disappears, test abnormality
2. If the connection to A and C is reversed, or if HWJ and TWJ are used interchangeably, the test results will be inaccurate.
3. State 2 adds a fixed delay; the T2 timing is inaccurate.
4. No timeout protection has been configured; when the circuit breaker fails to trip, the instrument will remain idle for an extended period.
5. The input/output contact type (NO/NC) was not verified, resulting in failure to recognize the position change signal.