186-9497-0015

Configure MiCOM P30 cold restart procedure

publish:2024-09-19 09:01:00   source : 施耐德    author :FAQ    views :163
FAQ 施耐德 publish:2024-09-19 09:01:00  
163
The procedure is as follows:
1. Set device off-line.

A. It can be achieved by Easergy Studio:



B. By means of keys on front panel (HMI)

  1. Go through:  Parameters > Function parameters > Global > MAIN to the parameter: [003.030] MAIN   Device on-line
  2. Push 'ENTER'
  3. Enter password (default one is: 'LEFT' > 'RIGHT' > 'UP' > 'DOWN' > 'ENTER' (LED: EDIT MODE lights on)
  4. Change value to 'No (= off)'
  5. Accept with 'ENTER' key (LED: OUT OF SERVICE lights on)
2. Execute cold restart.

This could be done from HMI only !

  1. Go through: Operation > Control and testing > MAIN > to the position [009.254] MAIN   Cold restart
  2. Push 'ENTER'
  3. Enter password (default one is: 'LEFT' > 'RIGHT' > 'UP' > 'DOWN' > 'ENTER' (LED: EDIT MODE lights on)
  4. Change value to 'EXECUTE'
  5. Accept with 'ENTER' key

3. Reset alarms

A. It can be achieved by Easergy Studio:



B. By means of keys on front panel (HMI)
  1. Go through:  Operation > Control and testing > MT_RC to the parameter: [003.008] MT_RC Reset record. USER
  2. Push 'ENTER'
  3. Enter password (default one is: 'LEFT' > 'RIGHT' > 'UP' > 'DOWN' > 'ENTER' (LED: EDIT MODE lights on)
  4. Change value to 'Execute'
  5. Accept with 'ENTER' key (LED: ALARM lights off permanently)

Warning
If ALARM LED is in ON position - please read content of the monitoring record and act accordingly. Check the Technical Manual for details.



  Tel

  18694970015

  Email

  sales@njzndq.com 

     WeChat 

   

WeChat QR code
Nanjing Zhuneng Electric Co., Ltd

Mobile number: 18694970015

WeChat: power1411913

Email: sales@njzndq.com

Address: Building 16, Liandong U Valley Industrial Park, No.24 XuefuRoad, Jiangbei New District, Nanjing, Jiangsu, China

Copyright © 2024 Guodian Nanjing Automation Co., Ltd. All rights reserved.
Contact
Navigation
WhatsApp
Cloud computing support Feedback Manage